| Management number | 220580900 | Release Date | 2026/05/03 | List Price | $224.11 | Model Number | 220580900 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
304 stainless steel shower set,emerncy eye wash shower,eyewash showers emerncy,shower set,tool partsEyewash shower setFor example, wall-mounted eyewash, also known as wall-mounted eyewash, wall-mounted eyewash, wall-mounted eyewash and so on.technical parameterNominal pressure: 0.4MPASealing pressure: 0.45MPAWorking pressure: 0.20~0.4OMPASpray flow L/min : 120-180Eyewash flow L/min : 12Applicable conditions: pure water at room temperature or water that meets hygienic standardsThe compound emerncy eye washing device is widely used in the danrous working areas and laboratories of pharmaceutical, chemical, petrochemical, electronic and semiconductor enterprises. When a chemical liquid or toxic substance splashes on the body, face, eyes of the staff or a fire causes the clothing of the staff to catch fire, the device can quickly reduce the harm to the lowest level and reduce the harm of the toxic substance to the staffPerformance parameters:Nominal pressure: 0.4MPaSealing pressure: 0.45MPaWorking pressure: 0.20 ~ 0.40MPaSpray flow L / min: 120-180Eyewash flow L / min: 12Applicable conditions: pure water at room temperature or water meeting the sanitary standardStructural features:1. Use ball valve to control spray and eye wash respectively. Convenient operation, fast opening and closing, reliable sealing.2. the outlet of the sprinkler nozzle is a soft foaming water flow, which improves the cleaning efficiency by 50% compared with the common eye washing nozzle.3. It is super resistant to the corrosion of acid, alkali, salt, oil and other chemicals.Installation and commissioning:1. The product model, certificate, instruction manual and packing list shall be rechecked before installation.2. The installation position shall be within 15 meters from the accident prone place, and the flushing place can be reached within 10 seconds at the running speed.3. Installation and commissioning:A. connection between the base and the lower part of the riser: screw the material belt around the base thread to connect with the water outlet tee.B. installation of base: adjust the direction of tee draina outlet according to the position of draina pipe, mark the drilling position according to the screw hole of base, and then set M10 expansion screw or anchor bolt according to the ground level.C. install the flushing pipeline: screw the flushing nozzle on the elbow of the horizontal pipe of the nozzle, wrap the material belt around the other end of the nozzle pipe, screw it on the upper half of the riser, adjust the direction to make the direction of the flushing nozzle downward, and then lock the nozzle pipe with the back nut;D. connect the upper half and the lower half: place the upper half and the lower half into the upper half and tighten the upper half.E. install the eyewash basin: wrap the material belt around the thread of the lower part of the eyewash basin, and connect and tighten it with the reducing tee of the lower part.F. installation of double nozzle eyewash part: put g ½ "mesh pad into G ½" lock nut and connect with G ½ "connecting pipeTighten.G. connect the water inlet pipe and drain pipe, and check whether the ball valve switch is flexible and in place, and whether there is jamming.H. the middle of the two pipes of the eye wash double nozzle is the eye wash flow regulating valve, and the flow of the eye wash nozzle is controlled by the flow regulating valve. The factory has been debugd. However, due to the difference of water supply pressure and flow, it can be readjusted on site during installation to the appropriate flow for human eyes. Adjustment method: screw off the top protective cap, use a slotted screwdriver to adjust the valve rod, rotate clockwise, and reduce the flow. Rotate counter clockwise to increase the flow.Tips:1. The product is used in the environment above 0 , if it is used below 0 , the pipeline antifreeze maintenance is required;2. Before installation, please flush the water inlet pipe in advance;3. It is recommended to install the water inlet control valve in the water inlet pipeline. After use, close the water inlet control valve first, and then close th
| Size | 1 |
|---|---|
| Color | A |
| Item Weight | 22 pounds |
| Part Number | 1005004070520985 |
| Manufacturer | LJIA |
| Power Source | ac |
| Number Of Pieces | 1 |
| Item model number | 1005004070520985 |
| Batteries Required | No |
| Package Dimensions | 25.59 x 12.99 x 7.87 inches |
| Item Package Quantity | 1 |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form